Inspection of condition of all parts used in the motor. |
| • |
Inspection report if requested. |
| • |
Submission of quotation with advice of cost and delivery. |
| • |
100% cleaning of every part. |
| • |
Rewinding of Armature with replacement of commutator in case of PMDC Servo Motors or replacement of Armature Disc in case of Disc Motor. |
| • |
Replacement of Bearings, Brushes, Shims and pre-load components. |
| • |
Replacement as necessary of any other unserviceable parts – note that the delivery time is subjected to the availability of spares. |
| • |
Magnetizing of magnets wherever necessary. |
| • |
Rebuild and run for at least 4 hours load test. |
| • |
Fully functional test and calibration to manufacturer’s specifications. |
| • |
Every motor is supplied with a full test certificate detailing the motor’s mechanical and electrical characteristics. |
| • |
All the repaired motors are covered by 6 months warranty. |